33/11kV Substation EPC — Meghna Group of Industries

Substation EPC Client: Meghna Group of Industries (MGI) 📍 Meghnaghat Industrial Zone, Narayanganj
🏗️

Project Specifications

33/11kV Substation, 20 MVA (2 x 10 MVA)

Key Facts & Metrics
  • Client: Meghna Group of Industries (MGI)
  • Location: Meghnaghat Industrial Zone, Narayanganj
  • Capacity: 33/11kV Substation, 20 MVA (2 x 10 MVA)
  • Completion: November 2024
  • Project Status: ✓ Fully Commissioned

Turnkey Engineering Support:

Senior EPC Hotline: +880 1712-345678
Email: info@positivepowerbd.com

Project Overview & Engineering Scope

Positive Power Bangladesh Ltd successfully engineered, supplied, erected, and commissioned a state-of-the-art 33/11kV industrial intake substation for Meghna Group of Industries at their flagship Meghnaghat manufacturing complex.

To support massive inductive motor loads and continuous pulp, paper, and consumer goods manufacturing lines, our team delivered a dual 10 MVA oil-immersed power transformer setup with an automatic on-load tap changer (OLTC) ensuring rock-solid 11kV busbar voltage stability during national grid fluctuations.

Scope of Turnkey Engineering

  • Turnkey architectural and civil foundation design for 33kV outdoor gantry towers, transformer plinths, and oil catchment separation pits.
  • Supply and erection of two (2) 10 MVA 33/11kV ONAN/ONAF oil-immersed power transformers with Buchholz relay, WTI/OTI trip units, and nitrogen fire suppression.
  • 33kV outdoor switchyard installation including motorized disconnectors, lightning arresters, and vacuum circuit breakers (VCB).
  • 11kV indoor metal-clad switchgear panel room featuring 12 outgoing vacuum feeder cubicles with microprocessor numerical protection relays.
  • Full secondary wiring, SCADA control desk, CT/PT ratio testing, and BPDB grid interconnection clearance.

Delivered Scope of Work

  • Turnkey EPC Substation Contracting
  • Civil foundation & structural gantry erection
  • Supply & erection of 2 x 10 MVA Power Transformers
  • 33kV Outdoor Switchyard with VCB and Disconnectors
  • 11kV Indoor Metal-Clad Switchgear (12 Cubicles)
  • Substation Automation & SCADA integration

Delivered Equipment & Systems

  • ▪ 2 x 10 MVA 33/11kV Power Transformers (Dyn11)
  • ▪ 33kV Outdoor Vacuum Circuit Breakers (31.5kA 3s)
  • ▪ 11kV Air-Insulated Metal-Clad Switchgear (AIS)
  • ▪ Schneider MiCOM Numerical Protection Relays
  • ▪ 110V DC Battery Bank with Dual Float Boost Charger
  • ▪ Double-busbar CT/PT Tariff Metering Cubicles
“

Positive Power delivered our 20 MVA substation ahead of schedule with zero safety incidents. The quality of transformer fabrication and neat switchgear busbar workmanship exceeded our strict corporate engineering standards.

— Meghna Group of Industries (MGI)
Engineering Excellence

Our Turnkey Engineering Commitments

Every project is executed under ISO 9001:2015 quality frameworks with full single-point accountability from concept to national grid energization.

⚙️ Turnkey Responsibility

Complete ownership of geotechnical surveys, civil gantry foundations, transformer erection, switchgear installation, and primary testing.

🏛️ Utility & Regulatory Clearance

Full technical liaison with BPDB, BREB, DPDC, and DESCO ensuring smooth tariff metering verification and official grid synchronization.

🛡️ 24/7 Operations & Maintenance

Post-commissioning support backed by emergency on-site technical teams, routine oil testing, thermographic inspections, and OEM parts.

Project Inquiries

Request a Proposal for Your Facility

Planning a new industrial substation, BBT plant overhaul, or captive generator synchronization? Share your project specifications below for a prompt feasibility review.

Request a Quote & Contact Form
Portfolio

Explore More Engineering Projects

🏗️
Square Pharmaceuticals Ltd

Electrical Panel Setup — Square Pharmaceuticals

Custom fabrication of Form 4b Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom…

Kaliakoir Hi-Tech Park, Gazipur View Case Study →
🏗️
Akij Group (Akij Particle Board & Textile Mills)

Generator Synchronization System — Akij Group

Automated multi-generator synchronization and load-sharing panel setup managing 5 MVA captive power with automated…

Manikganj & Trishal Complexes View Case Study →
🏗️
DBL Group (Mawna Composite Plant)

Industrial Rooftop Solar Plant — DBL Group

Turnkey 2.4 MWp industrial rooftop solar installation with Tier-1 bifacial panels, string inverters, and…

Mawna, Gazipur View Case Study →