33/11kV Grid Substation EPC Projects
High-Voltage Industrial Intake
Substation EPC
Client: Meghna Group
33/11kV Substation EPC — Meghna Group
Turnkey 20 MVA 33/11kV grid intake substation featuring dual 10 MVA oil-immersed power transformers with OLTC, outdoor switchyard gantry, 33kV VCBs, and 12-cubicle 11kV indoor metal-clad switchgear.
- Capacity: 20 MVA (2 x 10 MVA Dyn11 Transformers)
- Location: Meghnaghat Industrial Zone, Narayanganj
- Integrated SCADA numerical protection & BPDB grid clearance
- Delivered ahead of schedule with zero safety incidents
Substation EPC
Client: PRAN-RFL
Turnkey Substation EPC — PRAN-RFL Group
Complete EPC delivery for dedicated 33/11kV industrial park substation powering high-speed aseptic bottling and packaging lines at Habiganj Agro Park, including BREB line tapping.
- Capacity: 10 MVA 33/11kV Substation & Distribution Feeders
- Location: Habiganj Industrial Park, Sylhet
- 33kV outdoor switchyard with SF6 breakers & isolators
- Automatic Power Factor Improvement (PFI) 1000 kVAR panel
Industrial Power Distribution & BBT
Low Voltage Plant Distribution
Plant Distribution
Client: Beximco Group
Power Distribution System — Beximco Industrial Park
Plant-wide low-voltage overhaul replacing legacy cables with 6300A sandwich copper Busbar Trunking (BBT) lines, Main Distribution Boards (MDBs), and motorized drawout ACB panels across 400 acres.
- Capacity: 6300A, 4000A, 2500A BBT & 16 MVA Low Voltage Plant
- Location: Kashimpur, Gazipur
- Eliminated voltage drops across high-speed textile spinning lines
- Executed during scheduled maintenance windows with zero downtime
Cleanroom MCC
Client: Square Pharma
Electrical Panel Setup — Square Pharmaceuticals
Custom engineering and fabrication of Form 4b intelligent Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom distribution boards conforming strictly to WHO-cGMP requirements.
- Capacity: Form 4b MCCs & 1200 kVAR Detuned Harmonic PFI
- Location: Kaliakoir Hi-Tech Park, Gazipur
- Siemens SIMOCODE smart motor management with Modbus telemetry
- Pristine electrical power quality for sterile injectable formulation
Captive Power & Renewable Energy Projects
Genset Synchronization & Solar EPC
Synchronization
Client: Akij Group
Generator Synchronization System — Akij Group
Automated 4-generator paralleling and load-sharing switchboard managing 5 MVA captive power with automated peak shaving, motorized ACBs, and cloud SCADA telemetry.
- Capacity: 4 x 1250 kVA Multi-Genset Auto-Paralleling
- Location: Manikganj & Trishal Complexes
- ComAp InteliGen & Deep Sea DSE8610 digital controllers
- Zero-interruption transition during national grid outages
Solar Net Metering
Client: DBL Group
2.4 MWp Rooftop Solar Plant — DBL Group
Turnkey 2.4 MWp industrial rooftop solar installation featuring 4,360 Tier-1 bifacial panels, string inverters, and BREB Net Metering integration for a LEED Platinum export textile facility.
- Capacity: 2.4 MWp Rooftop PV (3.1 Million kWh/Year)
- Location: Mawna, Gazipur
- Zero roof membrane penetration clamp mounting system
- Annual carbon emission reduction of 2,100 metric tons
Turnkey Engineering & Commissioning Lifecycle
Our structured 6-stage engineering process ensures total compliance with BPDB, BREB, and BNBC standards while guaranteeing strict milestone adherence.
Site Assessment & Load Study
Soil resistivity, geotechnical tests, utility grid fault calculations, and short-circuit level simulation.
Detailed Electrical & Civil Design
Single line diagrams (SLD), gantry structural drawings, relay coordination curves, and BREB approval sets.
Gazipur Factory Fabrication
CNC punching, automated powder coating, 99.9% copper busbar bending, and routine factory testing.
Civil Erection & Heavy Rigging
Reinforced concrete plinths, transformer skidding, gantry steel erection, and cable trench construction.
Testing & Grid Synchronization
Megger, Hi-Pot, contact resistance, primary injection, relay timing, and official utility energization.
24/7 Warranty & Maintenance
As-built CAD documentation, operations training, routine oil testing, and 24/7 on-call technical support.