▶

Watch Featured Documentary

Duration: 6 Minutes | 4K Ultra HD

Featured Facility Tour

Gazipur Panel Manufacturing Facility Tour

Take an in-depth tour of our cutting-edge switchgear fabrication plant in Gazipur. Witness our high-precision CNC turret punches, automated powder coating, busbar processing, and rigorous routine testing bays.

Request Factory Visit

Technical Video Library

Commissioning, Testing & Fabrication Videos

▶
33/11kV Substation EPC Energization

Meghnaghat 20 MVA Project Documentary

Meghna Group 33/11kV Substation Commissioning

Comprehensive on-site footage showing civil gantry foundation construction, 10 MVA transformer heavy rigging, outdoor switchyard wiring, and final BPDB grid tie-in.

▶
High-Voltage Transformer Routine Testing

Laboratory FAT Testing Bay Operations

Power Transformer Factory Acceptance Testing

Watch our quality assurance engineers perform turns ratio tests, winding resistance measurements, dielectric breakdown voltage (BDV) scans, and temperature rise tests.

▶
CNC Punching & Automated Powder Coating

Gazipur Precision Fabrication Bay

Precision Switchgear Sheet Metal Fabrication

Demonstration of automated CNC turret punching, hydraulic multi-axis press brake bending, and 7-stage chemical pretreatment powder coating achieving 1,000-hour salt spray rating.

▶
Multi-Genset 5 MVA Auto-Synchronization

Akij Group Captive Power Plant

4 x 1250 kVA Generator Synchronization Testing

Live demonstration of automated phase angle matching, automated generator start/stop sequencing, peak shaving, and zero-interruption switchover during simulated grid failures.

Subscribe to Our Official Engineering Media Channels

Follow Positive Power Bangladesh on YouTube, LinkedIn, and Facebook for technical webinars, substation commissioning videos, and industrial energy updates.