Power Distribution System — Beximco Industrial Park
Project Specifications
6300A Busbar Trunking (BBT) & 16 MVA Low Voltage Distribution
Key Facts & Metrics
- Client: Beximco Group
- Location: Kashimpur, Gazipur
- Capacity: 6300A Busbar Trunking (BBT) & 16 MVA Low Voltage Distribution
- Completion: August 2024
- Project Status: ✓ Fully Commissioned
Turnkey Engineering Support:
Senior EPC Hotline: +880 1712-345678
Email: info@positivepowerbd.com
Project Overview & Engineering Scope
At the sprawling 400-acre Beximco Industrial Park in Kashimpur, Positive Power Bangladesh executed a comprehensive low-voltage distribution overhaul to modernize electrical supply lines for high-speed spinning, weaving, and digital printing plants.
The project replaced legacy heavy copper cable runs with ultra-compact, high-efficiency sandwich-type copper Busbar Trunking (BBT) rated up to 6300A, drastically reducing line voltage drop, transmission losses, and thermal congestion across electrical shafts.
Delivered Scope of Work
- Plant-wide low voltage distribution engineering
- Fabrication and erection of 6300A sandwich copper BBT runs
- Turnkey installation of Main Distribution Boards (MDB)
- Motorized Air Circuit Breaker (ACB) feeder panels
- Infrared thermographic scanning and load balancing
Delivered Equipment & Systems
- ▪ 6300A, 4000A, and 2500A Sandwich Copper BBT Lines
- ▪ Main Distribution Boards (MDB) with ABB Emax2 Drawout ACBs
- ▪ Sub-Distribution Boards (SDB) with Schneider Compact NSX MCCBs
- ▪ Multifunction digital power meters with RS-485 Modbus telemetry
The transition to Positive Power BBT systems dramatically eliminated voltage drops across our spinning floors. Their engineering team worked during scheduled plant maintenance windows without interrupting our export production lines.
— Beximco GroupOur Turnkey Engineering Commitments
Every project is executed under ISO 9001:2015 quality frameworks with full single-point accountability from concept to national grid energization.
⚙️ Turnkey Responsibility
Complete ownership of geotechnical surveys, civil gantry foundations, transformer erection, switchgear installation, and primary testing.
🏛️ Utility & Regulatory Clearance
Full technical liaison with BPDB, BREB, DPDC, and DESCO ensuring smooth tariff metering verification and official grid synchronization.
🛡️ 24/7 Operations & Maintenance
Post-commissioning support backed by emergency on-site technical teams, routine oil testing, thermographic inspections, and OEM parts.
Request a Proposal for Your Facility
Planning a new industrial substation, BBT plant overhaul, or captive generator synchronization? Share your project specifications below for a prompt feasibility review.
Explore More Engineering Projects
Electrical Panel Setup — Square Pharmaceuticals
Custom fabrication of Form 4b Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom…
Generator Synchronization System — Akij Group
Automated multi-generator synchronization and load-sharing panel setup managing 5 MVA captive power with automated…
Industrial Rooftop Solar Plant — DBL Group