33/11kV Substation EPC — Meghna Group of Industries
Project Specifications
33/11kV Substation, 20 MVA (2 x 10 MVA)
Key Facts & Metrics
- Client: Meghna Group of Industries (MGI)
- Location: Meghnaghat Industrial Zone, Narayanganj
- Capacity: 33/11kV Substation, 20 MVA (2 x 10 MVA)
- Completion: November 2024
- Project Status: ✓ Fully Commissioned
Turnkey Engineering Support:
Senior EPC Hotline: +880 1712-345678
Email: info@positivepowerbd.com
Project Overview & Engineering Scope
Positive Power Bangladesh Ltd successfully engineered, supplied, erected, and commissioned a state-of-the-art 33/11kV industrial intake substation for Meghna Group of Industries at their flagship Meghnaghat manufacturing complex.
To support massive inductive motor loads and continuous pulp, paper, and consumer goods manufacturing lines, our team delivered a dual 10 MVA oil-immersed power transformer setup with an automatic on-load tap changer (OLTC) ensuring rock-solid 11kV busbar voltage stability during national grid fluctuations.
Scope of Turnkey Engineering
- Turnkey architectural and civil foundation design for 33kV outdoor gantry towers, transformer plinths, and oil catchment separation pits.
- Supply and erection of two (2) 10 MVA 33/11kV ONAN/ONAF oil-immersed power transformers with Buchholz relay, WTI/OTI trip units, and nitrogen fire suppression.
- 33kV outdoor switchyard installation including motorized disconnectors, lightning arresters, and vacuum circuit breakers (VCB).
- 11kV indoor metal-clad switchgear panel room featuring 12 outgoing vacuum feeder cubicles with microprocessor numerical protection relays.
- Full secondary wiring, SCADA control desk, CT/PT ratio testing, and BPDB grid interconnection clearance.
Delivered Scope of Work
- Turnkey EPC Substation Contracting
- Civil foundation & structural gantry erection
- Supply & erection of 2 x 10 MVA Power Transformers
- 33kV Outdoor Switchyard with VCB and Disconnectors
- 11kV Indoor Metal-Clad Switchgear (12 Cubicles)
- Substation Automation & SCADA integration
Delivered Equipment & Systems
- ▪ 2 x 10 MVA 33/11kV Power Transformers (Dyn11)
- ▪ 33kV Outdoor Vacuum Circuit Breakers (31.5kA 3s)
- ▪ 11kV Air-Insulated Metal-Clad Switchgear (AIS)
- ▪ Schneider MiCOM Numerical Protection Relays
- ▪ 110V DC Battery Bank with Dual Float Boost Charger
- ▪ Double-busbar CT/PT Tariff Metering Cubicles
Positive Power delivered our 20 MVA substation ahead of schedule with zero safety incidents. The quality of transformer fabrication and neat switchgear busbar workmanship exceeded our strict corporate engineering standards.
— Meghna Group of Industries (MGI)Our Turnkey Engineering Commitments
Every project is executed under ISO 9001:2015 quality frameworks with full single-point accountability from concept to national grid energization.
⚙️ Turnkey Responsibility
Complete ownership of geotechnical surveys, civil gantry foundations, transformer erection, switchgear installation, and primary testing.
🏛️ Utility & Regulatory Clearance
Full technical liaison with BPDB, BREB, DPDC, and DESCO ensuring smooth tariff metering verification and official grid synchronization.
🛡️ 24/7 Operations & Maintenance
Post-commissioning support backed by emergency on-site technical teams, routine oil testing, thermographic inspections, and OEM parts.
Request a Proposal for Your Facility
Planning a new industrial substation, BBT plant overhaul, or captive generator synchronization? Share your project specifications below for a prompt feasibility review.
Explore More Engineering Projects
Electrical Panel Setup — Square Pharmaceuticals
Custom fabrication of Form 4b Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom…
Generator Synchronization System — Akij Group
Automated multi-generator synchronization and load-sharing panel setup managing 5 MVA captive power with automated…
Industrial Rooftop Solar Plant — DBL Group
Turnkey 2.4 MWp industrial rooftop solar installation with Tier-1 bifacial panels, string inverters, and…