Power Distribution System — Beximco Industrial Park

Industrial Power Distribution Client: Beximco Group 📍 Kashimpur, Gazipur
🏗️

Project Specifications

6300A Busbar Trunking (BBT) & 16 MVA Low Voltage Distribution

Key Facts & Metrics
  • Client: Beximco Group
  • Location: Kashimpur, Gazipur
  • Capacity: 6300A Busbar Trunking (BBT) & 16 MVA Low Voltage Distribution
  • Completion: August 2024
  • Project Status: ✓ Fully Commissioned

Turnkey Engineering Support:

Senior EPC Hotline: +880 1712-345678
Email: info@positivepowerbd.com

Project Overview & Engineering Scope

At the sprawling 400-acre Beximco Industrial Park in Kashimpur, Positive Power Bangladesh executed a comprehensive low-voltage distribution overhaul to modernize electrical supply lines for high-speed spinning, weaving, and digital printing plants.

The project replaced legacy heavy copper cable runs with ultra-compact, high-efficiency sandwich-type copper Busbar Trunking (BBT) rated up to 6300A, drastically reducing line voltage drop, transmission losses, and thermal congestion across electrical shafts.

Delivered Scope of Work

  • Plant-wide low voltage distribution engineering
  • Fabrication and erection of 6300A sandwich copper BBT runs
  • Turnkey installation of Main Distribution Boards (MDB)
  • Motorized Air Circuit Breaker (ACB) feeder panels
  • Infrared thermographic scanning and load balancing

Delivered Equipment & Systems

  • ▪ 6300A, 4000A, and 2500A Sandwich Copper BBT Lines
  • ▪ Main Distribution Boards (MDB) with ABB Emax2 Drawout ACBs
  • ▪ Sub-Distribution Boards (SDB) with Schneider Compact NSX MCCBs
  • ▪ Multifunction digital power meters with RS-485 Modbus telemetry
“

The transition to Positive Power BBT systems dramatically eliminated voltage drops across our spinning floors. Their engineering team worked during scheduled plant maintenance windows without interrupting our export production lines.

— Beximco Group
Engineering Excellence

Our Turnkey Engineering Commitments

Every project is executed under ISO 9001:2015 quality frameworks with full single-point accountability from concept to national grid energization.

⚙️ Turnkey Responsibility

Complete ownership of geotechnical surveys, civil gantry foundations, transformer erection, switchgear installation, and primary testing.

🏛️ Utility & Regulatory Clearance

Full technical liaison with BPDB, BREB, DPDC, and DESCO ensuring smooth tariff metering verification and official grid synchronization.

🛡️ 24/7 Operations & Maintenance

Post-commissioning support backed by emergency on-site technical teams, routine oil testing, thermographic inspections, and OEM parts.

Project Inquiries

Request a Proposal for Your Facility

Planning a new industrial substation, BBT plant overhaul, or captive generator synchronization? Share your project specifications below for a prompt feasibility review.

Request a Quote & Contact Form
Portfolio

Explore More Engineering Projects

🏗️
Square Pharmaceuticals Ltd

Electrical Panel Setup — Square Pharmaceuticals

Custom fabrication of Form 4b Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom…

Kaliakoir Hi-Tech Park, Gazipur View Case Study →
🏗️
Akij Group (Akij Particle Board & Textile Mills)

Generator Synchronization System — Akij Group

Automated multi-generator synchronization and load-sharing panel setup managing 5 MVA captive power with automated…

Manikganj & Trishal Complexes View Case Study →
🏗️
DBL Group (Mawna Composite Plant)

Industrial Rooftop Solar Plant — DBL Group

Turnkey 2.4 MWp industrial rooftop solar installation with Tier-1 bifacial panels, string inverters, and…

Mawna, Gazipur View Case Study →