Industrial Rooftop Solar Plant — DBL Group
Project Specifications
2.4 MWp Industrial Rooftop Net Metering Solar PV System
Key Facts & Metrics
- Client: DBL Group (Mawna Composite Plant)
- Location: Mawna, Gazipur
- Capacity: 2.4 MWp Industrial Rooftop Net Metering Solar PV System
- Completion: September 2024
- Project Status: ✓ Fully Commissioned
Turnkey Engineering Support:
Senior EPC Hotline: +880 1712-345678
Email: info@positivepowerbd.com
Project Overview & Engineering Scope
Positive Power engineered, procured, and constructed a flagship 2.4 MWp industrial rooftop solar photovoltaic installation across the spinning and dyeing roofs of DBL Group’s Mawna manufacturing facility.
The installation utilizes Tier-1 550W bifacial Mono-PERC modules mounted on specialized aerodynamic aluminum roof clamps requiring zero roof membrane penetration. The system generates over 3.1 million kWh of green electricity annually, directly reducing carbon emissions and qualifying the facility for high-tier global sustainability certifications.
Delivered Scope of Work
- Turnkey solar EPC including structural load analysis
- Supply of 4,360 units of 550W Tier-1 Bifacial Solar Modules
- Installation of 20 x 110kW String Inverters with DC combiner boxes
- Net Metering approval, testing, and synchronization with BREB grid
- Centralized cloud SCADA weather station and solar yield dashboard
Delivered Equipment & Systems
- ▪ 550W Tier-1 Monocrystalline Bifacial Solar PV Modules
- ▪ Huawei / Sungrow 110kW High-Efficiency Commercial Inverters
- ▪ Bi-directional 11kV Net Metering Tariff Metering Panel
- ▪ Type 1+2 Surge Protection and High-Voltage DC Switch disconnectors
Positive Power’s solar installation has significantly reduced our peak electricity utility bill while providing clean green energy that satisfies our international buyers’ strict ESG requirements.
— DBL Group (Mawna Composite Plant)Our Turnkey Engineering Commitments
Every project is executed under ISO 9001:2015 quality frameworks with full single-point accountability from concept to national grid energization.
⚙️ Turnkey Responsibility
Complete ownership of geotechnical surveys, civil gantry foundations, transformer erection, switchgear installation, and primary testing.
🏛️ Utility & Regulatory Clearance
Full technical liaison with BPDB, BREB, DPDC, and DESCO ensuring smooth tariff metering verification and official grid synchronization.
🛡️ 24/7 Operations & Maintenance
Post-commissioning support backed by emergency on-site technical teams, routine oil testing, thermographic inspections, and OEM parts.
Request a Proposal for Your Facility
Planning a new industrial substation, BBT plant overhaul, or captive generator synchronization? Share your project specifications below for a prompt feasibility review.
Explore More Engineering Projects
Power Distribution System — Beximco Industrial Park
Industrial power distribution upgrade featuring sandwich cast-resin Busbar Trunking (BBT) up to 6300A, MDBs,…
Electrical Panel Setup — Square Pharmaceuticals
Custom fabrication of Form 4b Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom…
Generator Synchronization System — Akij Group