Project Overview & Engineering Scope
For PRAN-RFL Group’s largest food and agro-processing park in Habiganj, Positive Power delivered a comprehensive 33/11kV electrical substation from initial site surveying through to final Breb transmission line energization.
The facility powers high-speed aseptic bottling lines, automated packaging plants, and multi-ton industrial refrigeration compressors, engineered with multi-tier redundant protection to prevent any electrical transients from damaging sensitive packaging robotics.
Delivered Scope of Work
- Full Turnkey EPC Contracting (Engineering, Procurement, Construction)
- 33kV Overhead line tapping & structural dead-end tower construction
- Oil-immersed power transformer erection and oil filtration
- 11kV Indoor AIS Switchgear and cable trench routing
- BREB inspection, relay testing, and official energization
Delivered Equipment & Systems
- ▪ 10 MVA 33/11kV Power Transformer with Off-Circuit Tap Changer
- ▪ 33kV Outdoor SF6 Circuit Breaker and Disconnector Isolators
- ▪ 11kV Metal-Clad Indoor Switchgear Panels (8 Feeders)
- ▪ Automatic Power Factor Improvement (PFI) 1000 kVAR Panel
From civil construction to electrical testing, Positive Power proved their exceptional EPC capability. Their project managers handled all BREB liaison and technical approvals seamlessly.
— PRAN-RFL Group (Habiganj Agro Park)Our Turnkey Engineering Commitments
Every project is executed under ISO 9001:2015 quality frameworks with full single-point accountability from concept to national grid energization.
⚙️ Turnkey Responsibility
Complete ownership of geotechnical surveys, civil gantry foundations, transformer erection, switchgear installation, and primary testing.
🏛️ Utility & Regulatory Clearance
Full technical liaison with BPDB, BREB, DPDC, and DESCO ensuring smooth tariff metering verification and official grid synchronization.
🛡️ 24/7 Operations & Maintenance
Post-commissioning support backed by emergency on-site technical teams, routine oil testing, thermographic inspections, and OEM parts.
Request a Proposal for Your Facility
Planning a new industrial substation, BBT plant overhaul, or captive generator synchronization? Share your project specifications below for a prompt feasibility review.
Explore More Engineering Projects
Power Distribution System — Beximco Industrial Park
Industrial power distribution upgrade featuring sandwich cast-resin Busbar Trunking (BBT) up to 6300A, MDBs,…
Electrical Panel Setup — Square Pharmaceuticals
Custom fabrication of Form 4b Motor Control Centers (MCC), harmonic-filtered PFI plants, and cleanroom…
Generator Synchronization System — Akij Group
Automated multi-generator synchronization and load-sharing panel setup managing 5 MVA captive power with automated…